Print

Print


Re: BOM PSG Annual Report 2008 Jane Bachman <a href="/index.htm?LOGON=A3%3Dind0903%26L%3DSISO-EXCOM%26E%3Dquoted-printable%26P%3D957821%26B%3D--8b72bd9c28bb4a2d887796b783032cf3%26T%3Dtext%252Fhtml%3B%2520charset%3DUTF-8%26XSS%3D3%26header%3D1" target="_parent" >[log in to unmask]</a> <a href="/index.htm?LOGON=A3%3Dind0903%26L%3DSISO-EXCOM%26E%3Dquoted-printable%26P%3D957821%26B%3D--8b72bd9c28bb4a2d887796b783032cf3%26T%3Dtext%252Fhtml%3B%2520charset%3DUTF-8%26XSS%3D3%26header%3D1" target="_parent" >[log in to unmask]</a>

Version 4 of the BOM PSG Annual report containing the following updates per editorial comments submitted prior to EXCOM vote:

1) This wording in section 8.0 is a little funny, "it is highly recommended that SISO continue to stand up a BOM PSG." The PSG has already been stood up. Also, the BPDSP requires balloted products to have PSGs, so I would recommend striking this.
2) Section 8.3 is missing inter-paragraph breaks.

 

-Jane



To unsubscribe from the SISO-EXCOM list, click the following link:
https://discussions.sisostds.org/index.htm?SUBED1=SISO-EXCOM