Print

Print


PDG Members,

 

Attached are two files documenting that the results from the RPR-FOM and GRIM ballots are both VALID and SUCCESSFUL.

 

The two files are:

 

1.  20140410 SISO-STD-001-Draft GRIM Ballot Results.pdf

2.  20140410 SISO-STD-001.1-Draft RPR FOM Ballot Results.pdf

 

#1.  Is a PDF showing the formal analysis of validity and success for SISO-STD-001-Draft.  The ballot results validate the ballot was both valid and successful.

 

#2.  Is a PDF showing the formal analysis of validity and success for SISO-STD-001.1-Draft.  The ballot results validate the ballot was both valid and successful.

 

The SAC reviewed the report and accepted the results. These are documented the SAC meeting notes from last week and will be formally released.

 

-- Paul

(RPR & GRIM TAD)

 

 

Paul Lowe
787 Landing Gear Systems

Everett, WA
(C) 714-791-0497
NOTICE: This communication may contain privileged or other confidential information. If you are not the intended recipient, or believe that you have received this communication in error, please do not print, recopy, disseminate, or otherwise use the information. Please indicate to the sender that you have received this e-mail in error. Thank
you.

 

“One mustn’t criticize other people on grounds where he can’t stand perpendicular himself.” – Mark Twain

 

 



To unsubscribe from the SAC-PDG-RPR list, click the following link:
https://discussions.sisostds.org/index.htm?SUBED1=SAC-PDG-RPR